In this guide
Most residential electricians end up pricing two ways at once. Work you've done a hundred times, like adding a circuit, swapping a panel or hanging fixtures, gets a flat price, because you know how long it takes and clients prefer a number. Work you can't predict, troubleshooting above all, goes by the hour, because nobody knows how long a fault takes to find until it's found. The skill is building the flat prices from real numbers, so they don't quietly drift below what the work costs.
Build a flat price from four parts
A flat price is labor, materials, the cost of showing up, and anything passed through, rolled into one number the client sees.
Here is a dedicated 20A circuit for a basement freezer, run 45 feet from the panel through an unfinished ceiling:
| Part | How it's figured | Amount |
|---|---|---|
| Labor | 2.5 hours at a $110 billable rate | $275.00 |
| Materials | $82 at cost (cable, breaker, receptacle, box, plate), plus 25% | $102.50 |
| Trip | Share of drive time, fuel and truck for one visit | $75.00 |
| Flat price | $452.50, rounded to $450 | |
| Permit | Passed through at cost, on its own line | $95.00 |
- The billable rate is not your wage
- $110 has to cover the hours you don't bill, like driving, estimating and supply runs, plus payroll taxes, insurance and overhead. The labor cost calculator works out what yours needs to be. Pricing labor at a wage-based rate is the most common reason flat prices lose money.
- Materials get a markup, and it's not greed
- It covers ordering, picking up, stocking the truck and standing behind the part. A 25 percent markup is a 20 percent margin on those materials. See markup vs margin for why the two numbers differ.
- The trip is a real cost
- Folding it into the hourly rate makes small jobs lose money. Some electricians show it as a separate trip charge. Others build it into every flat price. Either way, it has to be there.
Adjust for conditions, not for the client
The same circuit is a different job in a finished basement, an attic in August, or a slab house. Flat-rate price books handle this with a few difficulty levels rather than a new price every time:
- Standard: open framing or unfinished space, short run, panel has room.
- Moderate: finished walls to fish through, a longer run, attic or crawlspace access.
- Difficult: plaster, masonry, full panel, anything that needs patching or a subpanel.
Price the difficulty from what you'll face, write it on the estimate ("run through finished wall, includes one access hole, patch not included"), and the price explains itself.
Keep troubleshooting hourly
Troubleshooting is where flat prices go to die. Price it as a service call covering the first hour, then hourly after that, and say so before you start. Once you've found the fault, the repair itself can be flat-priced like any other task. Many electricians credit the service call toward the repair if the client approves it on the spot. That's a fair way to close the job without giving the diagnosis away.
Check the price against the job afterwards
A flat price is a prediction. After a handful of the same job, compare what you charged with what the jobs actually took, in hours and materials. If basement circuits keep taking 3.5 hours instead of 2.5, the price book is wrong, not the crew. The job profit calculator shows a finished job's margin, and the electrical estimate template has lines already set up for a service upgrade.
Wage data for context: the Bureau of Labor Statistics publishes median pay for electricians nationally and by state. That's a wage, not a billing rate. Your rate has to sit well above it.
What did that job really make?Profit and margin for any job in seconds.FAQ
Should electricians charge by the hour or by the job?
Both. By the job for predictable tasks, where clients want a fixed number and you're rewarded for being efficient. By the hour for troubleshooting and anything with hidden conditions.
How much should an electrician charge per hour?
Enough to cover the wage, payroll costs, non-billable hours, overhead and profit. That's usually far above the wage itself. Work it out from your own costs rather than copying a competitor's rate, whose overhead isn't yours.
Should the permit be included in a flat price?
Show it separately. Permit fees vary by city and job, and a separate line shows the client you're pulling one.




